A specialist piling subcontractor for solar and civil works in Ireland. Bring pile driving, pre-drilling and pull-out testing into your construction programme with Proseed Energy’s own machinery and experienced crews.
Four dedicated ramming machines. Nationwide coverage.
Solar pile driving / Machinery & crew on site
Delivery capacity
Equipped for your programme.
Own machinery. Experienced crews.
Up to600posts rammed per day
Up to300posts pre-drilled per day
4dedicated ramming machines in our own fleet
Irelandnationwide project coverage
Daily output depends on ground conditions, pile specifications, site access and the agreed scope. Ramming and pre-drilling capacities are separate indications, not combined daily totals.
From tender to mobilisation
Define the package. Plan the work fronts.
Solar piling, pre-drilling, pull-out tests and civil post driving — with scope and site interfaces agreed around your project requirements.
ProcurementShare quantities, drawings and tender dates for scope review.
Site planningDiscuss ground conditions, access, phasing and machinery availability.
Engineering interfaceAgree installation and test criteria with your project team.
Specialist subcontract support for EPCs, main contractors and civil engineering teams. Enquire about a single service or a combined piling scope.
01
Utility-scale solar
Solar pile driving
Installation of driven steel posts for ground-mounted solar structures, following the project pile layout and installation specification. Agree pile types, embedment, tolerances and work areas before mobilisation.
Ground-mounted solar piling packages
Extraction and rectification scope reviewed separately
Post driving for road and civil works, including barrier, fencing and other driven-post applications, subject to project specifications and ground conditions.
Roadside and infrastructure projects
Post types, access and installation requirements reviewed
On-site testing to assess pile resistance against the project engineer’s specified criteria. Test scope, loading requirements and reporting are agreed before works begin.
Completed ramming and pre-drilling scopes on Irish solar projects, with pull-out testing performed across six sites.
Ramming completed
Over 100 MW
of solar project capacity in Ireland
Pre-drilling completed
Over 25 MW
of solar project capacity in Ireland
Pull-out tests performed
6 sites
across our testing experience
MW figures refer to the capacity of solar projects on which the respective works were completed; they are not additive. Client and project names are withheld under confidentiality agreements.
Ireland / Solar piling
Driven posts. Difficult-ground support.
Site photographs show our tracked piling machinery, crews positioning steel posts and installed foundations. Discuss your ground conditions, pile schedule and installation requirements with us to establish a suitable scope.
01 / Steel post installation02 / Pre-drilling equipment on site03 / Pull-out testing · load measurement
Our machinery
Four machines. One coordinated team.
Our own fleet of four dedicated ramming machines, allocated to suit project scope and availability. From mobilisation to site works, machinery and crew planning are coordinated around your programme.
Own machine fleet / Mobilisation & transportRamming machines / Site preparation
Built for site delivery
A piling scope that fits your site programme.
Piling interfaces with setting out, groundworks and mounting structure installation. Use the pre-start review to define responsibilities, work fronts and inspection requirements with your site team.
Review the pile schedule, drawings, ground investigation and test requirements. Clarify the installation scope, exclusions and approach to refusals before pricing.
02 / Plan
Align crews, plant & programme
Agree work fronts, access, setting-out responsibilities, pile supply and site safety requirements. Confirm machinery allocation and mobilisation against availability.
03 / Deliver
Install, test & coordinate
Define inspection points, installation records and test reporting before works begin. Agree how ground issues, refusals and changes will be referred to the site team and project engineer.
Planning your works
Solar piling in Ireland: common questions.
Scope and planning information for EPC procurement teams, project managers and main contractors.
What is solar ramming or pile driving?
Solar ramming drives steel posts into the ground to support mounting structures for ground-mounted solar panels. Post positions, embedment and installation requirements follow the project drawings and specifications.
When is pre-drilling needed for solar piles?
Pre-drilling may be needed where ground conditions prevent conventional driving or a post reaches refusal. The ground information and project design determine whether pre-drilling is suitable and how the installation method should be agreed.
What does a pile pull-out test check?
A pull-out test assesses how a pile resists extraction under specified loads. The project engineer defines the test method and acceptance criteria. Share the required loads and test specification with your enquiry.
Can we enquire at tender stage?
Yes. Share the site location, indicative pile schedule, available drawings, tender deadline and proposed programme. Highlight assumptions and missing ground information so the scope can be reviewed before pricing. Detailed plans can be requested after your initial enquiry.
What should be agreed before mobilisation?
Confirm the scope, drawings and installation criteria, ground information, access, pile supply, setting out, work fronts and site safety requirements. Agree inspection records, test reporting and the process for refusals or design queries with the project team.
How many posts can Proseed install per day?
Indicative capacity is up to 600 posts rammed per day or up to 300 posts pre-drilled per day. These are separate capacities. Ground conditions, pile specifications, access and the agreed scope affect actual daily output.
Do you provide ramming services throughout Ireland?
Proseed offers nationwide project coverage in Ireland using its own fleet of four dedicated ramming machines. Mobilisation and equipment allocation depend on project requirements and availability.
Start with your project
Planning a piling package?
Send a tender enquiry or discuss an upcoming site requirement. We’ll review the scope, identify the information needed and discuss machinery availability and pricing.
Include with your enquiry
Site location, access and intended work areas
Pile types, quantities and available ground information
Tender deadline, target start date and phasing
For testing: specification, sample quantities and required loads
No drawings to hand? Start with a brief description. We can request plans when we reply.